检查井模具的详细数据也是有着规定的 |
添加时间:2019/12/16 15:12:12 浏览次数: |
检查井模具的详细数据也是有着规定的,这是供检查人员或者专业设备检测的井室,大多都是不过水的,承载能力与以前的砖砌井和塑料井相比有了质的改变,而且使用混凝土一次成型的施工效率更快。 The detailed data of inspection well mould is also specified. This is the well chamber for inspection by inspectors or professional equipment, most of which are water-free. Compared with the previous brick well and plastic well, the bearing capacity has changed qualitatively, and the construction efficiency of one-time molding with concrete is faster. 排水检查井模具用的是钢模板焊接,虽然造价有了提高,相比之下,质量的改变更应该值得引起注意,钢模具的优势明显,做出来的混凝土预制产品密实度也是很高的,满足了检查井与管道衔接设计的要求,根据排水管道的大小和数量的不同所以有的时候排水井的设计也有不同,这是为了让排水的效果更好,有的还分成了上井室和下井室的组成部分,用部分带动整体的流动性更好,收水口是在井室和井圈之间的位置,作用就是调整井室内径尺寸,所以承压力也是经得住考验的。建成以后的排水检查井,我们应该经过检验合格后再使用,它的质量规格形状都应该符合规定。 The mould of drainage inspection well is welded with steel formwork. Although the cost has been improved, the change of quality should be paid more attention. The advantage of steel mould is obvious, and the compactness of the prefabricated concrete product is also very high, which meets the requirements of connecting design of inspection well and pipeline. According to the different size and quantity of drainage pipeline, sometimes the mould of drainage well is welded There are also differences in the design, which is to make the drainage effect better. Some of them are also divided into the upper chamber and the lower chamber, and use the part to drive the overall fluidity better. The water intake is located between the chamber and the well circle, and its function is to adjust the inner diameter of the chamber, so the bearing pressure can stand the test. After the completion of the drainage inspection well, we should use it after passing the inspection, and its quality, specification and shape should meet the requirements. |
上一页 钢筋混凝土排水井主要是在市政地下工程使用的 |
下一页 预制装配化混凝土检查井主要成型方式 |
Copyright © 技术支持:遨游网络