返回首页

河北检查井模具厂

本站导航

新闻动态

当前位置:网站首页 > 新闻动态 > 详细信息
黄土土质条件下的塑料排水检查井施工
添加时间:2019/5/22 16:38:25     浏览次数:
1)一般土质、软土土质、季节性冻土土质和湿陷性黄土土质条件下的塑料排水检查井施工;
1) Construction of plastic drainage inspection wells in general soil, soft soil, seasonal frozen soil and collapsible loess;
2)一般车道的地面荷载按汽车总重15t(后轮压5t);消防车道的地面荷载按汽车总重30t(后轮压6t)设计。
2) Ground load of general lane is 15 t (rear wheel pressure 5 t) and that of fire lane is 30 t (rear wheel pressure 6 t).
3)建筑小区(居住区、公共建筑区、厂区等)范围内埋地塑料排水管道外径不大于800mm、埋设深度不大于6m、不下井操作的塑料排水检查井工程的设计、施工和维护保养。

3) Design, construction and maintenance of plastic drainage inspection wells in residential areas (residential areas, public buildings, factories, etc.) with buried plastic drainage pipes of no greater than mojulj.37ix.com.cnpeidianfb.37ix.com.cnweilan.37ix.com.cntuoliutacc.37ix.com.cnjiaqiaob.37ix.com.

cnchuweiji.37ix.com.cn800 mm in diameter and no more than 6 m in depth.

4)地下水位按地面下不高于1.0m设计;
4) The groundwater level is not higher than 1.0 m below the ground.
5)抗震设防裂度为9度及9度以下的地区。
5) Seismic fortification in areas with crack resistance of 9 degrees and less than 9 degrees.
上一页  检查井钢模具采用组装的方式构成  
下一页  根据浇注系统型制的不同可将塑料模具分为三类
  • 关于我们
  • 新闻动态
  • 案例展示
  • 网上订单
  • 联系我们
  • 产品分类1
  • 产品分类2
  • 产品分类3

Copyright © 技术支持:遨游网络

  • 联系我们
  • 网上订单
  • 工程案例
  • 本站导航

搜索

  • 关于我们
  • 新闻动态
  • 案例展示
  • 网上订单
  • 联系我们
  • 产品分类1
  • 产品分类2
  • 产品分类3